Premium Roof Installation

Cedar Shake Roof Installation Guide

How cedar shake roofs are installed: decking, ventilation, underlayment, spacing, fastening, flashing, and ridge details.

Installation sequence

How the work commonly moves from preparation to final inspection.

1

Review structure and decking

2

Confirm ventilation

3

Install underlayment

4

Install required interlayment

5

Sort shakes by size and quality

6

Establish starter courses

7

Maintain proper side gaps

8

Install shakes with correct exposure

9

Complete flashing and valleys

10

Install ridge and hip details

11

Review moisture and airflow conditions

12

Complete final inspection

Materials and components

The products and details involved in the system.

Cedar shakes

Underlayment

Interlayment

Stainless or approved fasteners

Starter materials

Flashing

Valley metal

Ridge units

Ventilation components

Fire-treated products when required

Common shortcuts

Installation mistakes that can weaken performance.

Insufficient side gaps

Improper exposure

Skipping interlayment

Using unsuitable fasteners

Installing over poor ventilation

Mixing low-grade materials

Failing to account for moisture movement

Using short-life flashing

Inspection checkpoints

Details worth reviewing during and after installation.

Wood grade

Shake spacing

Exposure

Fastener placement

Interlayment

Ventilation

Flashing

Ridge and hip installation

Homeowner preparation

What to handle before the crew arrives.

Confirm wood grade

Review treatment requirements

Check insurance restrictions

Discuss maintenance expectations

Clear access for material storage

Protect landscaping

Confirm ventilation scope

Review natural color variation

Weather and scheduling

Conditions that can affect timing and installation methods.

Wet shakes require proper handling

Rain may delay installation

High humidity affects drying

Material sorting adds time

Fire-treated products may have longer lead times

Cold weather may affect membranes and sealants

Complex roofs require more custom cutting

Ventilation corrections may extend work

Warranty considerations

Installation choices that may affect warranty eligibility.

Use the specified wood grade

Follow treatment requirements

Use approved fasteners

Meet ventilation rules

Document product source

Preserve maintenance records

Avoid pressure washing

Review workmanship coverage

Frequently asked questions

Questions about cedar shake installation.

Why are gaps required between cedar shakes?+

Wood expands and contracts with moisture. Proper gaps support movement, drainage, and drying.

What is cedar interlayment?+

Interlayment is a layer installed between courses of shakes to provide additional water-shedding protection.

Does cedar roofing require special ventilation?+

Proper roof and attic ventilation are important because wood performance depends heavily on drying and moisture control.

Can cedar shakes be installed in wet weather?+

Installation conditions should be controlled carefully. Wet materials, rain, and moisture can affect handling and long-term performance.

Need property-specific guidance?

Schedule a professional roof inspection.

Get clear information about existing conditions, repairability, installation needs, and practical next steps.